Down to the waterfront…

Down to the waterfront…

In December of 2019 we first began talking with Ray about moving onto the new boat that he was having built in Knysna. In November 2020, George and I arrived in South Africa expecting the boat to be completed in Jan/Feb. And now, finally, after more than 3 years of design and construction, the very first Knysna 550 rolls out of the shop and down to the waterfront. The boat is so high that they could not install the helm and top of the flybridge in the factory.

Skip to toolbar